Southern City Gate Project
One of the largest investment in Hungary is the Southern City Gate development, for which we elaborated the Masterplan, and we provided support during the entire planning period of the Athletic Stadium.
The assignment consisted of 2 main elements:
- Elaboration of the district operational and development concept
- Providing professional operation support and vindicate conception in connection with future operation during the planning period in special regard to the Athletics Stadium also touchong the Rowing Center.
The concept development came into existence in several stages. As a first step, we outlined an operational model and evaluated the possible options for future operation. Following to this, the Masterplan planning began, which is normally an urban planning and developmen issue, but we were involved, since many architectural ideas have a significant impact on the future operation (such as energy supply, waste management, parking, etc.). Our company commented the completed documentation point by point, helping KKBK.
The other part of the assignment was the utilization and operator expertise during the design phases of the Athletics Stadium, Athletics Training Center and Rowing Center. The work required a daily presence and it was extremely multiple. Some of the elements:
- Defining the operator organization and set of the required space
- Expertise in the operation of the building services system in terms of safety and cost optimization
- Defining material uses
- Setting and commenting on space needs